Plans for July/August 2006
Most of the work is done !
- Lattice design incorporates LR BBI
- Closed BBI knobs defined, optimized, implemented (major effort)
- Effectiveness modelled and demonstrated during machine studies
Some thinking to do about design strategy
- Optimize lattice at higher bunch current ? 8x3 t1.b2 or 9x5 t1.b3 ?
- Lower design pretzel ? (Changes knob coefficients.)
- Calculate knob coefficients at what bunch current ? (Correlated with above)
Improve IP knob coefficient tuning by using both E and W bumps
Empirical tuning of knob strengths at operating current
Develop operating procedure